Quick answer: With Transpo Logistics, factory or machine relocation planning starts from the date the line must restart, then counts back to schedule every stage: disconnection, dismantling, packing, lifting, transport, positioning, reconnection and trial runs, each with an owner and a checkpoint.
Plans that start from moving day often end when the machine arrives, but the business needs the date it can produce again. Counting back shows when each stage must finish and where to add buffer.
The main stages are power and air disconnection, dismantling, packing, lifting and transport, positioning, reconnection and testing. Each needs an owner and a checkpoint before handover, so delays are visible immediately.
A machine list with priorities, origin and destination layouts, weights and lifting points, power and air requirements, plus routes and floor areas that can bear the load.
When a full stop is not possible, phased relocation keeps some lines producing while others move. A plan built back from restart makes the phase order clear.
How much time should we allow for testing?
It depends on the machine and quality standards; agree it with the manufacturer or engineering team early.
Should we move everything at once?
It depends on how long the business can stop. Many factories move in phases to limit impact.
Plan your relocation back from restart with Transpo: see our Project Moving service or call +66 2 105 8651.